Property photos
Freehold
Offers in region of
£495,000
(£0.12/sq. ft)
Land for sale
Freehold Former Landfill Site, Ridge Road, Micklefield, Leeds, West Yorkshire LS254,081,136 sq. ft
Local area information
Property location
Nearby amenities
- Micklefield 0.8 miles
- Micklefield Church of England Voluntary Controlled Primary School 1.1 miles
- Green Lane Primary Academy 1.2 miles
- East Garforth 1.4 miles
These distances are calculated in a straight line. The actual route and distance may vary.
Features and description
- Freehold
- Irregular and undulating in topography
- Former landfill site for non-hazardous and inert waste
- Two miles south of Micklefield
- No immediate neighbours
The property comprises an irregular shaped site extending to approximately 93.69 acres in total which is irregular and undulating in topography.
The site was formerly operated as a landfill used to store non-hazardous and inert waste, primarily from waste transfer stations.
The landfill ceased operation in 2019 and in that time the site has been gradually closed down. At present we understand capping works are almost complete and there are approximately 40-50,000 tonnes of top soil still to be laid with the final grass seeding to take place in winter 2025/26.
Final Construction Quality Assurance documentation to be produced upon completion.
Once closed, the remaining obligations on site will include general landscaping, maintenance of gas collection systems and environmental monitoring.
The environmental monitoring currently involves weekly perimeter landfill gas monitoring, monthly surface water monitoring and quarterly and annual groundwater and leachate monitoring. Although we understand these requirements should reduce over time.
The site was formerly operated as a landfill used to store non-hazardous and inert waste, primarily from waste transfer stations.
The landfill ceased operation in 2019 and in that time the site has been gradually closed down. At present we understand capping works are almost complete and there are approximately 40-50,000 tonnes of top soil still to be laid with the final grass seeding to take place in winter 2025/26.
Final Construction Quality Assurance documentation to be produced upon completion.
Once closed, the remaining obligations on site will include general landscaping, maintenance of gas collection systems and environmental monitoring.
The environmental monitoring currently involves weekly perimeter landfill gas monitoring, monthly surface water monitoring and quarterly and annual groundwater and leachate monitoring. Although we understand these requirements should reduce over time.
More information
Listed by
Banks Long & Co
View agent properties.png)
Property descriptions and related information displayed on this page are marketing materials provided by - Banks Long & Co. Zoopla does not warrant or accept any responsibility for the accuracy or completeness of the property descriptions or related information provided here and they do not constitute property particulars. Please contact Banks Long & Co for full details and further information.